Ground Consultants Limited have recently been involved in a commercial and residential development at Trevemper, Newquay.

The team have undertaken a regime of trial pitting to identify and delineate areas of geotechnically challenging ground, as well as offering advice in relation to off-site disposal and road construction.

The development includes a new petrol filling station, boasting eight pumps and 2 rapid electric charging bays, as well as a food store, residential development and hotel.

Similar Posts

  • Plate Bearing Tests Explained

    Plate Bearing Tests Explained Plate bearing tests, commonly referred to as “plate load tests” or “CBRs” are a quick and effective way to simulate an imposed load on the ground. The test has a range of implications, with the most common being to determine likely settlement under a specified load (for example for a crane…

  • Complex Geology Creates Challenges in Plymouth

    Complex Geology Creates Challenges in Plymouth The Plymouth area is challenging in both contamination and geotechnical aspects. Plymouth’s naval and industrial history, infilling of tidal creeks with waste and wartime destruction all make for a range of contamination challenges. Geotechnically too, layers of man-made ground and alluvial/tidal silt and peat hide a complex bedrock geology…

  • Phase 1 Desk Study St Agnes

    Phase 1 Desk Study St Agnes Ground Consultants Limited specialise in Phase 1 Desk Studies and other environmental services in the St Agnes area. The highly experienced team at Ground Consultants Limited have completed numerous Phase 1 Desk Studies in the St Agnes area, and are therefore well placed to assist with your next development….

  • Ground Investigation St Austell

    Ground Investigation St Austell If you’re planning a construction project, it’s essential to conduct a thorough ground investigation to assess the geotechnical and environmental conditions of the site. In March 2023, a combined geotechnical and environmental ground investigation was carried out at Truro Road, St Austell. The investigation involved several techniques, including windowless sample boreholes,…

  • Phase 2 Site Investigation

    What is a Phase 2 Site Investigation? Following completion of a Phase 1 Desk Study it may be necessary to commission a Phase 2 site investigation. This is the case if the Phase 1 Desk Study identified potential sources of contamination which require further investigation, an example of such would be predicted high arsenic, or…