GCL Provide Geotechnical Expertise at Trevemper, Newquay

Ground Consultants Limited have recently been involved in a commercial and residential development at Trevemper, Newquay.

The team have undertaken a regime of trial pitting to identify and delineate areas of geotechnically challenging ground, as well as offering advice in relation to off-site disposal and road construction.

The development includes a new petrol filling station, boasting eight pumps and 2 rapid electric charging bays, as well as a food store, residential development and hotel.

Similar Posts

  • Phase 1 Desk Study Plymouth

    Phase 1 Desk Study Plymouth Ground Consultants Limited supply a number of environmental and geotechnical services in Plymouth and surrounding areas. Ground Consultants Limited recently completed a Phase 1 Desk Study at a former industrial site in Plymouth. The former industrial land-use and nearby landfill presented a potential risk the future site users, however our…

  • Ground Investigation Portreath

    Ground Investigation Portreath Ground Consultants Limited offer a range of ground investigation services in the Portreath area. Ground Consultants Limited recently undertook a ground investigation in Portreath, involving rotary boreholes, hand excavated trial pits and dynamic probe lights (DPLs). Please get in touch below to see how we can help with; Phase 1 Desk Study…

  • High Levels of Nickel Identified on The Lizard Peninsular

    High Levels of Nickel Identified on The Lizard Peninsular Ground Consultants Limited recently completed a comprehensive Phase 2 Ground Investigation on behalf of Natural England and the Environment Agency for a proposed new visitor centre on the Lizard Peninsula, near Mullion. The objective of the investigation was to determine the geotechnical and environmental parameters of…

  • Phase 1 Desk Study Helston

    Phase 1 Desk Study Helston Ground Consultants Limited recently completed a Phase 1 Desk Study for a local developer in Tresowes Green, Helston. The proposed development involves the demolition of an existing stable block, and construction of a residential dwelling. Ground Consultants Limited were commissioned to provide a Phase 1 Desk Study to support the…

  • Phase 1 Desk Study Liskeard

    Phase 1 Desk Study Liskeard Ground Consultants Limited specialise in Phase 1 Desk Studies in Liskeard and surrounding areas. Liskeard has seen substantial growth in residential developments recently, and the team at Ground Consultants Limited have extensive experience in Phase 1 Desk Studies and ground investigation in the Liskeard area. For further information please get…