Marsh Mills STW – Ground Investigation for Major Stormwater Upgrade, Plymouth

Ground Consultants Ltd were appointed by Galliford Try Construction Ltd, on behalf of South West Water and Arcadis Consulting (UK) Ltd, to undertake a comprehensive Factual Ground Investigation at Marsh Mills Sewage Treatment Works, Plymouth. The works form part of the city’s £multi-million stormwater storage upgrade, designed to increase resilience and expand capacity from 3,108 m³ to 6,500 m³.

Working closely with Arcadis, GCL delivered all investigation works in strict accordance with the Ground Investigation Specification and relevant British Standards, including BS 5930, BS EN 1997-2 (Eurocode 7) and BS 10175. The team maintained continuous communication with both Arcadis and Galliford Try to ensure all technical, safety and environmental requirements were met throughout.

The investigation at Marsh Mills, Plymouth, included dynamic sampling and rotary coring to depths of 27–28 m, Standard Penetration Testing (SPT), and hand shear vane testing for near-surface strength assessment. GCL installed multi-level groundwater and gas monitoring wells to characterise hydrogeological conditions within the Upper Devonian Slate bedrock and overlying alluvial deposits.

Comprehensive geotechnical and geo-environmental laboratory testing was undertaken through UKAS-accredited facilities, including plasticity, particle size, strength, and contamination analyses. The resulting data informed foundation design, tank support options, and environmental risk assessment for the proposed above-ground stormwater tank.

The Marsh Mills Plymouth Ground Investigation highlights GCL’s proven capability to operate within complex, live wastewater treatment environments — safely, efficiently and to the highest technical standards.

Ground Consultants Ltd were proud to be recognised for their contribution in the official case study on Water Projects Online.

For clients across Plymouth, Devon and the South West, GCL continue to support major infrastructure programmes for Galliford Try, Arcadis, and South West Water, providing expert ground investigation, rotary coring, dynamic sampling, and geo-environmental testing services for the region’s most challenging civil engineering projects.

Similar Posts

  • Phase 1 Desk Study Plymouth

    Phase 1 Desk Study Plymouth Ground Consultants Limited supply a number of environmental and geotechnical services in Plymouth and surrounding areas. Ground Consultants Limited recently completed a Phase 1 Desk Study at a former industrial site in Plymouth. The former industrial land-use and nearby landfill presented a potential risk the future site users, however our…

  • Trial Pitting Near Hayle, Cornwall

    Trial Pitting Near Hayle, Cornwall Ground Consultants Limited recently completed a Phase 2 investigation in Reawla, Hayle for the development of 30 residential properties. The investigation aimed to analyse the levels of arsenic across the site, aiding off-site disposal and assessing human health risk. The investigation was carried out following a limited investigation completed by…

  • Phase 1 Desk Study Hayle

    Phase 1 Desk Study Hayle Ground Consultants Limited specialise in environmental and geotechnical investigation covering the Hayle area. Ground Consultants Limited have recently completed a number of Phase 1 Desk Studies in the Hayle area. Once such report was commissioned by a local architect to support submission of a planning application for conversion of a…

  • Ground Investigation St Austell

    Ground Investigation St Austell If you’re planning a construction project, it’s essential to conduct a thorough ground investigation to assess the geotechnical and environmental conditions of the site. In March 2023, a combined geotechnical and environmental ground investigation was carried out at Truro Road, St Austell. The investigation involved several techniques, including windowless sample boreholes,…

  • Phase 1 Desk Study Porthtowan

    Phase 1 Desk Study Porthtowan Ground Consultants Limited recently completed a Phase 1 Desk Study in Porthtowan for a proposed residential development The team were recently in Porthtowan conducting a Phase 1 Preliminary Risk Assessment (Desk Study) and associated mine search for a proposed residential development. Analysis of geochemical data, as well as nearby historic…