Phase 1 Desk Study Plymouth

Ground Consultants Limited supply a number of environmental and geotechnical services in Plymouth and surrounding areas.

Ground Consultants Limited recently completed a Phase 1 Desk Study at a former industrial site in Plymouth. The former industrial land-use and nearby landfill presented a potential risk the future site users, however our team of local experts were able to successfully negate risks at the Phase 1 Stage and prevent further costly investigation.

For more information on the following, please get in touch below!

Plymouth

Similar Posts

  • Pioneering the Way in Renewable Energy Infrastructure

    Pioneering the Way in Renewable Energy Infrastructure In an era defined by climate change concerns and a growing commitment to sustainable practices, Ground Consultants Limited (GCL) stands at the forefront of renewable energy infrastructure development. Specialising in ground engineering and consultancy services, GCL has carved a niche in the renewables sector, with a portfolio that…

  • Phase 1 Desk Study Bath

    Complex Phase 1 Desk Study in the Historic City of Bath Ground Consultants Limited have recently completed a Phase 1 Desk Study in the Historic city of Bath, at the site of an existing car garage and former petrol station. The team delved deep into the history of the site, as well as looking at…

  • Phase 1 Desk Study Newquay

    Phase 1 Desk Study Ground Consultants Limited offer a range of environmental and geotechnical services across the Newquay area. Newquay is rife with development, both residential and commercial. Ground Consultants Limited have helped numerous clients get their development through planning, most recently for the development of 21 commercial units just outside of Newquay. Please get…

  • Trevemper Nears Completion

    Trevemper Site Nears Completion Ground Consultants Limited (GCL) have over the past 12 months been involved in the implementation and verification of earthworks relating to the construction of a petrol filling station and new link road at Trevemper, Newquay. A number of ground investigations have been completed over various phases, indicating the presence of landfill…

  • BRE 365 Testing in Maidenhead

    BRE 365 Testing in Maidenhead GCL is excited to announce our recent work at Desborough Park, Maidenhead, UK, where we were commissioned to carry out a topographical survey and scheduled BRE 365 soakaway testing. Although the BRE 365 tests were postponed, our team was able to complete the essential topographical survey, which will play a…

  • Phase 1 Desk Study Penzance

    Phase 1 Desk Study Penzance Ground Consultants Limited are environmental and geotechnical specialists covering the Penzance area. Ground Consultants Limited recently conducted a Phase 1 Desk Study in Sancreed, near Penzance. The planning application was for conversion of redundant agricultural buildings into dwellings, and our contaminated land report concluded that no further work from a…