Similar Posts

  • Phase 1 Desk Study Truro

    Phase 1 Desk Study Truro Ground Consultants Limited offer a wide range of environmental and geotechnical services in Truro and surrounding areas. Ground Consultants Limited recently conducted a complex Phase 1 Desk Study in central Truro for a residential development. Historic mining activities in the local area resulted in an increased risk from certain contaminants…

  • Phase 1 Desk Study Penzance

    Phase 1 Desk Study Penzance Ground Consultants Limited are environmental and geotechnical specialists covering the Penzance area. Ground Consultants Limited recently conducted a Phase 1 Desk Study in Sancreed, near Penzance. The planning application was for conversion of redundant agricultural buildings into dwellings, and our contaminated land report concluded that no further work from a…

  • Phase 2 Ground Investigation Ilfracombe

    Phase 2 Ground Investigation Ilfracombe Ground Consultants Limited recently completed a Phase 2 Ground Investigation for a proposed residential development in Ilfracombe town centre. The comprehensive ground investigation involved the sinking of a number of trial pits in areas of proposed soft landscaping, followed by chemical laboratory testing. Following detailed reporting by Ground Consultants Limited,…

  • Ground Investigation Bugle

    Ground Investigation, Bugle The team recently completed a combined environmental and geotechnical ground investigation at a proposed residential development in Bugle. The Phase 1 Desk Study (completed by a third party) identified risks from former commercial usage on site, as well as a potential backfilled pond. Our intrusive investigation involved six windowless sample boreholes, four…

  • Ground Investigation St Austell

    Ground Investigation St Austell If you’re planning a construction project, it’s essential to conduct a thorough ground investigation to assess the geotechnical and environmental conditions of the site. In March 2023, a combined geotechnical and environmental ground investigation was carried out at Truro Road, St Austell. The investigation involved several techniques, including windowless sample boreholes,…