contamination

  • Phase 1 Desk Study Helston

    Phase 1 Desk Study Helston Ground Consultants Limited recently completed a Phase 1 Desk Study for a local developer in Tresowes Green, Helston. The proposed development involves the demolition of an existing stable block, and construction of a residential dwelling. Ground Consultants Limited were commissioned to provide a Phase 1 Desk Study to support the…

  • Phase 1 Land Contamination Report in West Park, Redruth

    Phase 1 Land Contamination Report in West Park, Redruth Ground Consultants Limited recently completed a Phase 1 Desk Study in West Park, Redruth. Our team of highly experienced ground engineers identified risks from high naturally occurring arsenic, as well as historic mining. Relative predicted bioavailability data, as well as the proposed landscaping plan were used…

  • Site Investigation St Agnes

    Site Investigation St Agnes Ground Consultants Limited recently completed a combined environmental and geotechnical investigation at the site of a proposed residential development in St Agnes. The investigation followed a detailed Phase 1 Desk Study completed by GCL. The investigation comprised windowless sample boreholes, trial pitting with soakaway testing, and CBR tests for foundation design….

  • Phase 1 Desk Study Liskeard

    Phase 1 Desk Study Liskeard Ground Consultants Limited specialise in Phase 1 Desk Studies in Liskeard and surrounding areas. Liskeard has seen substantial growth in residential developments recently, and the team at Ground Consultants Limited have extensive experience in Phase 1 Desk Studies and ground investigation in the Liskeard area. For further information please get…

  • Phase 1 Desk Study St Agnes

    Phase 1 Desk Study St Agnes Ground Consultants Limited specialise in Phase 1 Desk Studies and other environmental services in the St Agnes area. The highly experienced team at Ground Consultants Limited have completed numerous Phase 1 Desk Studies in the St Agnes area, and are therefore well placed to assist with your next development….

  • Phase 1 Desk Study Camborne

    Phase 1 Desk Study Camborne Ground Consultants Limited offer both environmental and geotechnical services in the Camborne area. Intense historic mining in the Camborne area has resulted in high levels of heavy metals, namely Arsenic and Lead. Ground Consultants Limited specialise in Phase 1 Desk Studies for planning applications and are highly experienced in dealing…

  • Phase 1 Desk Study Plymouth

    Phase 1 Desk Study Plymouth Ground Consultants Limited supply a number of environmental and geotechnical services in Plymouth and surrounding areas. Ground Consultants Limited recently completed a Phase 1 Desk Study at a former industrial site in Plymouth. The former industrial land-use and nearby landfill presented a potential risk the future site users, however our…

  • Phase 1 Desk Study Bude

    Phase 1 Desk Study Bude Ground Consultants Limited provide a number of environmental and geotechnical services in Bude and surrounding areas. Bude is an increasingly popular tourist destination, and a sought after area for both commercial and residential development. Our highly experienced team have conducted a number of Phase 1 Desk Studies in the Bude…

  • Phase 1 Desk Study Truro

    Phase 1 Desk Study Truro Ground Consultants Limited offer a wide range of environmental and geotechnical services in Truro and surrounding areas. Ground Consultants Limited recently conducted a complex Phase 1 Desk Study in central Truro for a residential development. Historic mining activities in the local area resulted in an increased risk from certain contaminants…

  • Phase 1 Desk Study St Mawes

    Phase 1 Desk Study St Mawes Ground Consultants Limited offer a wide range of environmental and geotechnical services in St Mawes and surrounding areas. The ever popular tourist destination is a magnate for developers and those wishing to build their dream home, or even their second home. There is significant architectural diversity in the area,…