Ground Consultants Limited recently completed a Phase 1 Desk Study for a local developer in Tresowes Green, Helston.

The proposed development involves the demolition of an existing stable block, and construction of a residential dwelling.

Ground Consultants Limited were commissioned to provide a Phase 1 Desk Study to support the planning application.

It was determined that due to very high levels of predicted naturally occurring arsenic, as well as historic mining, that a Phase 2 Investigation would be necessary. For more information on the Phased Approach to Land Contamination, please see our page on Environmental Risk Assessment, which includes a handy flow chart.

Engine House Tresowes Green

Similar Posts

  • Ground Investigation Truro

    Ground Investigation Truro The team were recently in Playing Place, near Truro, conducting a ground investigation for a proposed residential development of four houses. The investigation involved the sinking of 6 windowless sample boreholes to refusal, along with three trial pits with soakaway testing. The investigation encountered highly weathered slates, making for excellent drainage potential…

  • Site Investigation St Agnes

    Site Investigation St Agnes Ground Consultants Limited recently completed a combined environmental and geotechnical investigation at the site of a proposed residential development in St Agnes. The investigation followed a detailed Phase 1 Desk Study completed by GCL. The investigation comprised windowless sample boreholes, trial pitting with soakaway testing, and CBR tests for foundation design….

  • Ground Investigation Porthtowan

    Ground Investigation Porthtowan Ground Consultants Limited recently completed a combined environmental, geotechnical and mining investigation at a site in Porthtowan, following on from our recent Phase 1 Desk Study Back in June 2022, we completed a Phase 1 Desk Study at a site in Porthtowan, where it is proposed to develop a number of residential…

  • Ground Investigation St Austell

    Ground Investigation St Austell If you’re planning a construction project, it’s essential to conduct a thorough ground investigation to assess the geotechnical and environmental conditions of the site. In March 2023, a combined geotechnical and environmental ground investigation was carried out at Truro Road, St Austell. The investigation involved several techniques, including windowless sample boreholes,…

  • Phase 1 Desk Study Camborne

    Phase 1 Desk Study Camborne Ground Consultants Limited offer both environmental and geotechnical services in the Camborne area. Intense historic mining in the Camborne area has resulted in high levels of heavy metals, namely Arsenic and Lead. Ground Consultants Limited specialise in Phase 1 Desk Studies for planning applications and are highly experienced in dealing…