Phase 2 Ground Investigation Ilfracombe

Ground Consultants Limited recently completed a Phase 2 Ground Investigation for a proposed residential development in Ilfracombe town centre.

The comprehensive ground investigation involved the sinking of a number of trial pits in areas of proposed soft landscaping, followed by chemical laboratory testing.

Following detailed reporting by Ground Consultants Limited, a Phase 3 remediation scheme will now be required prior to development.

The investigation was commissioned by Crabb Contractors

Trial Pit Spoil

Similar Posts