The Problem with Arsenic in Cornwall

The geology of Cornwall is unique, with todays landscape a relic of both geological and human processes. Heavy metal contamination is present across much of the country, with Arsenic levels varying in accordance with geological formations and their subsequent exploitation in the 19th and 20th Centuries. Although Arsenic has historically been extracted for use in paint, weedkillers and insecticides (most notably at Botallack in the late 19th Century), it was generally a by-product of tin and copper processing. Arsenic and other unwanted heavy metals were often deposited in mine waste tips close to the mine from which they were extracted.

In 2013 the British Geological Survey collected data on the spatial distribution of heavy metals across the Southwest, as part of the TellusSW Project. The extract below illustrates Arsenic distribution across the Southwest region; (Contains British Geological Survey materials © UKRI 2021).

Map showing the varying levels of Arsenic across the South West

In assessing the risk from Arsenic to sensitive receptors (e.g. humans), a Category 4 Screening Level (C4SL) of 37 mg/kg is used. This is a generic assessment criteria for Arsenic in residential soils in England. As can be seen above, much of the Southwest is above the 37 mg/kg threshold. In fact, a study by R. S. Middleton et al [2017] found that 69% of soils in Cornwall exceed the C4SL for Arsenic under the “Residential with Homegrown Produce” setting.

Most residential developments in Cornwall are now required to be assessed under the LCRM model, starting with a Phase 1 Desk Study. Bioaccessibility testing is a relatively inexpensive test which can help prevent costly remediation. This laboratory test essentially simulates the conditions inside the human digestive system, to determine the percentage of total Arsenic absorbed by the body. An average of 20% Bioaccessibility is generally accepted across Cornwall in naturally occurring soils. In certain circumstances this figure can be assumed at the Phase 1 stage to prevent unnecessary and costly physical testing.

To find out more, or to engage our team of experts to help with your project, please get in touch using the contact details below, or using our enquiry form.

Similar Posts

  • Trial Pitting Near Hayle, Cornwall

    Trial Pitting Near Hayle, Cornwall Ground Consultants Limited recently completed a Phase 2 investigation in Reawla, Hayle for the development of 30 residential properties. The investigation aimed to analyse the levels of arsenic across the site, aiding off-site disposal and assessing human health risk. The investigation was carried out following a limited investigation completed by…

  • Phase 2 Ground Investigation Ilfracombe

    Phase 2 Ground Investigation Ilfracombe Ground Consultants Limited recently completed a Phase 2 Ground Investigation for a proposed residential development in Ilfracombe town centre. The comprehensive ground investigation involved the sinking of a number of trial pits in areas of proposed soft landscaping, followed by chemical laboratory testing. Following detailed reporting by Ground Consultants Limited,…

  • Phase 1 Desk Study Truro

    Phase 1 Desk Study Truro Ground Consultants Limited offer a wide range of environmental and geotechnical services in Truro and surrounding areas. Ground Consultants Limited recently conducted a complex Phase 1 Desk Study in central Truro for a residential development. Historic mining activities in the local area resulted in an increased risk from certain contaminants…

  • Phase 1 Desk Study Helston

    Phase 1 Desk Study Helston Ground Consultants Limited recently completed a Phase 1 Desk Study for a local developer in Tresowes Green, Helston. The proposed development involves the demolition of an existing stable block, and construction of a residential dwelling. Ground Consultants Limited were commissioned to provide a Phase 1 Desk Study to support the…

  • Pioneering the Way in Renewable Energy Infrastructure

    Pioneering the Way in Renewable Energy Infrastructure In an era defined by climate change concerns and a growing commitment to sustainable practices, Ground Consultants Limited (GCL) stands at the forefront of renewable energy infrastructure development. Specialising in ground engineering and consultancy services, GCL has carved a niche in the renewables sector, with a portfolio that…

  • Trevemper Nears Completion

    Trevemper Site Nears Completion Ground Consultants Limited (GCL) have over the past 12 months been involved in the implementation and verification of earthworks relating to the construction of a petrol filling station and new link road at Trevemper, Newquay. A number of ground investigations have been completed over various phases, indicating the presence of landfill…