Phase 1 Desk Study St Austell

Ground Consultants Limited offer a range of environmental and geotechnical services across the St Austell area, including St Stephen, St Blazey and Fowey.

Ground Consultants Limited have completed a number of Phase 1 Desk Studies in the St Austell area, including most recently for the conversion of an agricultural building into a commercial unit in St Stephen. A mine search was commissioned alongside the Phase 1, provided by one of our local trusted partners.

Please get in touch below if you require any of the following for your upcoming project;

Sunset Over Hill

Similar Posts

  • Site Investigation St Agnes

    Site Investigation St Agnes Ground Consultants Limited recently completed a combined environmental and geotechnical investigation at the site of a proposed residential development in St Agnes. The investigation followed a detailed Phase 1 Desk Study completed by GCL. The investigation comprised windowless sample boreholes, trial pitting with soakaway testing, and CBR tests for foundation design….

  • BRE 365 Testing in Maidenhead

    BRE 365 Testing in Maidenhead GCL is excited to announce our recent work at Desborough Park, Maidenhead, UK, where we were commissioned to carry out a topographical survey and scheduled BRE 365 soakaway testing. Although the BRE 365 tests were postponed, our team was able to complete the essential topographical survey, which will play a…

  • Ground Investigation Truro

    Ground Investigation Truro The team were recently in Playing Place, near Truro, conducting a ground investigation for a proposed residential development of four houses. The investigation involved the sinking of 6 windowless sample boreholes to refusal, along with three trial pits with soakaway testing. The investigation encountered highly weathered slates, making for excellent drainage potential…

  • Phase 1 Desk Study Truro

    Phase 1 Desk Study Truro Ground Consultants Limited offer a wide range of environmental and geotechnical services in Truro and surrounding areas. Ground Consultants Limited recently conducted a complex Phase 1 Desk Study in central Truro for a residential development. Historic mining activities in the local area resulted in an increased risk from certain contaminants…